When drafting, what is the first step once the engine is placed at the edge of the water source?

Disable ads (and more) with a premium pass for a one time $4.99 payment

Prepare for the Indiana Fire Fighter Test. Study with multiple-choice questions and detailed explanations. Boost your confidence and get ready to ace your exam!

In the process of drafting water from a source, once the engine is positioned at the edge of the water source, the initial step involves ensuring that the hard suction hoses are ready and properly configured for operation. This means the hoses must be removed from their storage position and connected to the pump to create a secure pathway for drawing water.

Establishing this connection is critical because it allows the pump to create the necessary vacuum that will transport the water into the fire engine's tank. If this step is not completed first, the subsequent actions, such as turning on the pump or testing the water, cannot be effectively conducted. These steps rely on the hoses being properly set up to facilitate water movement. It’s essential to follow the correct sequence, as each step builds upon the last to ensure safe and efficient drafting operations.